The AI answer we saw
For European distributors, most Indian packaged snack food manufacturers set a minimum order quantity (MOQ) of 500 kg to 2 metric tons per SKU, though this varies by supplier. Lead times typically range from 3 to 6 weeks from order confirmation, including production and export documentation. For sea freight to Europe, add 20–30 days transit time. Ensure the supplier can provide EU-compliant labeling, ingredient declarations in required languages, and relevant certifications such as HACCP, ISO 22000, and organic or halal certification if needed.
Captured during this Readable report run. Answers can vary by AI tool and date.