The AI answer we saw
A complete home interior project for a 2BHK flat in India typically takes 45 to 75 days from design finalization to handover, depending on scope and city. The timeline breaks down roughly as: design and approval (1–2 weeks), material procurement and factory production of modular units (3–4 weeks), civil and false ceiling work (1–2 weeks), and installation and finishing (1–2 weeks). Delays can occur due to building society permissions, material availability, or scope changes. Choosing a company with in-house manufacturing and a dedicated project manager generally reduces delays. Always get a written timeline with milestone dates in your contract.